Pablo Cubiertas y Aluminios S.L.U.

Characteristics of the project

Supply and installation of a 5-tonne bridge crane for the industrial building.

Go to website

Problem

This company had to manipulate all the loads manually or with a forklift, with the subsequent loss of space, time and risk.

Solution

Once the bridge crane was installed, the building's space was optimised, and performance, ergonomics and safety were increased.