Lidl Supermercados S.A.U.

Characteristics of the project

Transfer of the chargers of 24 electric forklifts.

Go to website

Problem

To increase the storage space in the pre-chamber and free up space in the waste area, the chargers were moved to a new location. To do so, part of the existing structure was used. Additionally, several new modules were provided and the control switchboard was expanded.

Solution

After the move and expansion, the storage space was increased in two areas that needed it. Moreover, the chargers and forklifts were located in a more optimal location and were better integrated.